Build Update #5; Slab poured.
Just picked up 4 hemlock posts that are going to hold up the first floor decking and the 28’ 10”x8” in the center of the house. Spent the afternoon at the timber framers drooling over the frame stickered in the shed outside his shop. I watched him plane these timbers down to clean wood, and loaded them into a truck I borrowed from a buddy. We start framing in the walkout wall on Monday, and the first floor decking should be on by Wednesday, which is a huge step for me. The frame should be up by the 9th of July. I’m behind on uploading photos because I’m doing about 3 peoples job right now. More to come.